MBTA Concord Bridge Abatement
The MBTA Sudbury River Bridge in Concord, MA was one of three bridges that were altered for the MBTA Fitchburg Line Improvement project.
This bridge needed to be blasted and re-coated. Containment was critical as the existing coating contained Lead. – The blasting abatement and re-coating was successfully done by the John W. Egan Company.
Contact JOHN W. EGAN: (617) 244-6390 PO Box 600070 Newtonville, MA 02460 mcote@johnwegan.com Copyright © 2018 JOHN W. EGAN Co Inc. All Rights Reserved